Sunday, October 5, 2008
Poptropica Error While Connecting
The final report of IFUA (Institute for Environmental Analysis, Bielefeld) for the assessment of contaminants (loaded ingredients, contamination and pollution) in the digestate in the Kofermenteranlage Rotenhagen is now available. The ordinary citizens lack the expertise to be able to interpret the single chemical data, but the conclusions of IFUA everyone understands:
first "In terms of the sample digestate 1 also the values derived here assessment of MOH and DEHP have been exceeded so far that a sustainable agricultural use is to question ."
second "From an expert's View seems, for reasons of precautionary environmental and consumer protection more stringent quality control of input materials to the biogas plant advised. "
Hopefully, the editors do the coenzymes, plant and Council and administration of the city Werther these conclusions to heart!
Monday, September 29, 2008
Can You Go To A Fashion Show
Concerned Citizens in Werther have founded the "Association of Soil and water protection" . The members gather information on the subject, evaluate and draw attention to grievances, to prevent damage.
As the local press not interested in an objective educational shows, including the club this Blog for the dissemination of information use.
Tuesday, September 23, 2008
Forearm Baby Angle Wing Footprint Tattoos
and comments of a critical observer
Haller Circular, edition Werther, 16:09:08
"waiting with bated breath the city Werther currently on the ... study results of soil samples."
Remarks:
1) The Government has published the results long ago, but she keeps secret.
2) The citizens wanted soil samples. Soil samples are the "long memory" for pollutants. The operators of the coenzymes, plant and soil samples denied this "allowed" (!) Gärsubstratproben according to their "rules"!
Westphalia Journal, Issue Werther, 16:09:08
"For a year, the policy deals with substrate studies."
comments:
1) Politicians have called for a year, soil testing, and the operators have refused to this day. The "Black Peter" is unique among the operators and not the politicians!
2) The operators have instead used a year to allow only Gärsubstratproben. By different feeding, they can control the composition of the substrate. - A rogue who thinks evil of it ;-)
Haller Circular, edition Werther, 23:09:08
"Stefan Junge-Wentrup and Uwe Pahmeyer feel now as a political pawn. The application for the extension of their investment they made three years ago "
comments.
1) The documents for the application for an extension of the coenzymes, plant were submitted in June 2007 with the Government (up by my reckoning. today:.. 1 year and 3 months)
2) order to have security for ground and drinking water , the politicians called for a year without success, the soil testing results can be read above
3) There remains the simple question:
Why deny the operator as consistently as this calls for security for ground and drinking water and move the process thus even further into the track?
Friday, March 7, 2008
How To Shorten Curtains Rubber Band
The GNU (Association for Nature and environmental protection in Gütersloh eV) refer to their website position on the enlargement of the coenzymes plant in Werther / Rotenhagen:
"For months, is disputed in Werther about whether the biogas plant will be expanded in the yard Pahmeyer. This plant is in operation since 03/28/2002. Their first expansion of about 500 kW to 600 kW was made by the permit on 31.7.2006.
For the protection of the outer region are But such systems only privileged to 500 kW. (Circular of the MUNLV 27.10.2006) Why is this extension was yet made, is as unclear as the compatibility with the landscape plan Osning.
Since commissioning in-house next to pig manure and energy crops, non-operating substrates for co-digestion were used, & c., such as gastric -/Darminhalte from the large abattoir Tönnies, Flotatfette, a total of 14 680 t / year. This amount will now be almost tripled (to 35 000 t / year).
Not only that, but the catalog of the feedstock is expanded to include additional wastes from the agriculture industry.
Concerned citizens have turned to the GNU and asked to assess the hazard potential. In order not to inflame the dispute further, we have our Position, only those citizens and members informed of the Planning Committee of the City and asked for confidential treatment. Our letter but was promptly leaked to the Westfalen Blatt, which turned it into a comprehensive article in which the GNU was accused of false statements. This has led us to a reply that was not printed by the WB.
Find Now both our position to co-fermentation plant and our reply . "
Are you interested in the opinions of the GNU?
Then click on the bold tags!
Monday, February 18, 2008
Zte Tu-25 Usb Driver For Mac
On Saturday, the informed 16.02.2008, concerned citizens, the population in Werther with a flyer campaign over their concerns. Following is the text of the leaflet is reproduced.
here: Commercial disposal of organic industrial waste
blessing or a curse?
dangerous or safe?
We do not know - but we want to know!
why we are calling from an extension approval by
responses to the risks related to:
risk of drinking water,
lasting pollutant deposition in the soils,
million dollar renovation of the floors
by thorough
sampling of fermentation substrates, fermentation residues, soils, wells and drainage water!
date, the parties agreed only to a minimal consensus:
a digestate sample with repetition -
and only the consent of the operator!
The press coverage on this issue from our perspective is one-sided in favor of the company
Werther Bioenergy GmbH & Co. KG.
information from the perspective of concerned citizens to the Internet at
http://biogas-werther.blogspot.com/
or simply: "biogas worthy"
The next meeting of the Planning Committee on this subject on Tuesday, 19.02.2008, at City Hall. The meeting is public. Just go through it!
further information: Dr. Roland Eisele, Chemist, 05203-4388, 05203-6258
Saturday, February 9, 2008
Eczema Scars Dark Rid
uses the "bio" gas system Werther the name Bio "as a positive image. It is generally understood
including a plant ferments of renewable resources such as corn or rapeseed, and using the resulting digester gas (sonorous it is "biogas") a turbine for power generation drives. Such a system is running under the term "energy crops" (Renewable Resources).
In Rotenhagen is but a "coenzymes system. This plant is mainly with organic industrial waste operated. Those are some stomach and intestinal contents and Flotatfette from large abattoirs, dairy products, confectionery and food particles. So it is, strictly speaking, a waste treatment plant and a waste on the fields of environment and Werther.
soon to roll the daily 100 tons of it from all possible EU countries of Europe after Werther and be disposed of here! How do you like it?
are currently approved 40 tons daily, has begun it once with 6 tons daily
A citizen who has looked up
Covering Up Hyperpigmentation With Makeup
11/12/2007
at the district government
32756 Detmold
Ladies and Gentlemen,
in a template the Mayor of Werther, Weike woman, to the members of the Planning Committee of the City Werther, 30.10.2007, which states: "With representatives of the District Planning Authority, I am 22.10. conducted regarding the classification of state planning of the biogas plant in the planned scope of a voting meeting. The planned plant, the regional planning consent, provided the prospect is made. that the City Council the concept of a "unique position" decides this system. The possibilities raised by the investors for local heating were described as exemplary. "
Below I explain you my point of view.
On my account I put based on the following values from the literature:
gas Otto engine
electrical efficiency, from 30-41%, calculated at 41%
dual fuel
electrical efficiency: 35-45%, calculated with 45%
-> averaged 42%
On my bill I'm taking into account the different benefits and efficiencies of an averaged efficiency of the cogeneration plant of the above 42%. This follows from the highest values found in the literature.
According to the operator results in the production of energy as follows:
Jenbacher gas Otto engines
power 1052 kW / h -> performance at 68.2% calculated efficiency of 41%
pilot injection
power 490 kW / h -> performance at 31.8% calculated efficiency of 45%
Total: 1,542 kW / h -> Performance 100.0%
is ~ 13 507 MW, the annual electrical power, which will be paid with approximately 1.472 million €. As mentioned in the literature values obtained under optimal laboratory conditions, in practice at least 2% must be deducted. This corresponds to an electrical efficiency of the CHP of 40%.
case of a power generation of this magnitude At least 20261.88 MW of heat, which are at least 60%.
The average heat consumption in Germany is 170 kW of heat per year per square meter of living space. Because the average efficiency of heating equipment is 90%, is from a maximum demand of 150 kW per year and sqm assumed. (These figures are any utilities.)
The operator is for example based on a value that is 6 times higher than the national average.
Based on 6187 square meters, according to the operator, to be heated living space of 150 kW is calculated 928.05 MW heat per year. This came 3985 MW / year for the coenzymes system, the stable, the Bonbonentpackung and Kartoffelgarung. That's a total 4913.65 MW / year. They are up to 24% of the generated heat. (In the coenzymes system I came from a non-stop use, the Kartoffelgarung I have planned 4 hours daily in the Bonbonentpackung 12 hours daily throughout the year in which Stable heating 75% utilization in the year.)
Of the heat generated 20261.88 MW used so only a maximum of 24%. If we now take into account that, for example
- the energy balance of the entire system, not just the CHP is considered
- the system consumes less energy on warm days,
- the engines in the literature maximum efficiency not reach to come due to maintenance, wear, contaminated gas, etc.,
- motors are used that do not reach their design produces the highest given in the literature efficiencies
- the over time, less expectant energy needs of the living room due to legally required and / or voluntary improvements in the range of insulation and isolation
the actual practical use of thermal energy to well below 20% is being set. Accordingly, heating more than 80% of the generated heat of the atmosphere above the plant to deteriorate and the climate.
with 15 348 MW of unused waste heat per year could theoretically 102 320 m2 of living space to be heated. That equates to over 1000 apartments of 100 m2.
That to me also, for example, but not in a positive way. If you deviate from my perspective, I would love to get an explanation of your assessment. I would also like to ask you to explain to me your demand for "unique position of the plant.
For questions, literature and sources I would love you to also be available shortly.
Sincerely
NN
The author of this Letter is known to the administrator.
Unfortunately, he has received to date no response from the district government Detmold!
Did You Lose Your Mucus Plug Before Miscarriage
The so-called "biogas" plant in Werther / Red Hagen is a coenzymes system. The operators want to triple the capacity.
Both the type of plant as well as the widening offer a bleak critical approach. Concerned citizens feel but with their concerns and critical questions on the subject of the press left alone in favor of a one-sided coverage for the operator.
arises is why here in the near future, an alternative information page!
comments, questions, answers, suggestions and criticism are welcome!
Everyone can here - have your say - even anonymously!
The administrator of this blog will not verify the accuracy of the posts and assumes no responsibility in this regard. However, he will ensure that objectivity and decency remain protected.
We would be glad if you stop by again soon and maybe even participate in it.